Project Introduction
The project has built a 12t/h biomass gasifier and a 12t/h biomass gas steam boiler. The project was successfully put into production on June 21, 2018, with a construction period of 120 days. Since the project was put into production, it has been running smoothly for one year. The heating steam flow can meet the range of 4-12 tons/hour, and the pressure is stable at about 13 kg, which can meet the production needs of the owner. The completion of the project not only solves the environmental protection worries for the owner, but also provides the owner with high-quality steam, whose flow and pressure meet the owner's overloaded production volume during the peak season, which is well received by the owner.
The project site | Hubei Daye (Building Materials) |
Heating design | 1set of12tons gasifier with1set of12steam tons/hsteam boiler |
Heating requirements | 24h/d 340days/year |
Production date | 2018Nian6Yue |
Steam quality requirements | 1.6Mpa |
Project instruction | Due to the large amount of steam used by the booster axe in an instant, after using biogas to replace coal, the boiler heating rate is significantly increased by 30% compared with coal , which improves the owner's production efficiency. |
Steam pressure to ensure ≥1.0Mpa requirements
Project display
Figure 1 12t/h biomass gasifier
Figure 2 Gasification grate charcoal
Figure 3 12t/h biomass gas steam boiler
Figure 4 Boiler exhaust gas
Figure 5 Control room console
Figure 6 Biomass raw material stockyard