Project Description
Linyi Zhangzhuang Energy Station Project, built a 12t/h biomass gasifier and a 12/h steam boiler. The project was put into use at the beginning of 2019. The heating steam reached about 12t/h, and the pressure was stabilized at about 8 kg, meeting the heat demand of surrounding enterprises. The project has stable operation, safe and reliable heating, environmental protection up to standards, and high economic benefits.
Project display
The project site | Linyi, Shandong (centralized gas supply) |
Heating design | 1set of12tons gasifier with1set of12steam tons/hsteam boiler |
Heating requirements | 24h/d 330days/year |
Production date | 2019Nian4Yue |
Steam quality requirements | Centralized gas supply, credit card billing |
Project instruction | The project supplies8small steam units nearby with stable load regulation |
Figure 1 10t/h biomass gasifier
Figure 2 10t/h biomass gas steam boiler
Figure 3 Boiler chimney
Figure 4 Control room console